OUR DAILY SETTING OF ORAL IMPLANT SURGERY Ver.2 in 2019

Our Daily Setting of Oral Implant Surgery Ver.2 in 2019

Including Setting of Same-Day All-On-4 & Zygoma Implant Surgery 

Refer to Our Daily Setting of Oral Implant Surgery Ver.1 in 2013.






  • Changing to operation clothes and sterilizing in the mouth of the patient : outside of the operation room.  
  • Arranging of the instruments, machines and video filming in the ope. room: two sterilizing nurse and one non-sterilinzing nurse. 
  • Leading of the patient into the operation room. 
  • Preparation of intravenous sedation by the anesthesiologist. 
  • Cleaning and sterilizing on the hands of the operator. 
  • Wearing sterilizing clothe and gloves on the operator. 
  • Starting operation following sedation beginning. 
  • End of the surgery
  • Making Provisional Restoration with Implants.
  • Making P.V.S. Impression for Final Restoration while making Provisional.
  • Home-made Nutrition Smoothy is supplied instead of lunch during breaks.
  • Working model placement on the occlusional articulater after bite registration with Provisional.
  • Provisional Restration Placement.
  • CT-Scan Imaging for post-surgery.
  • Washing the instruments and preparing the patient coming home.                                                        







  • Pre-surgical setting.

    During surgery.


    Kato's Sinus-Membrane elevating kit for zygomatic Surgery.


    KDC Zygoma implant Kit 1.

    Bishop Retractor for zygomatic surgery.

    Nobel Zygoma depth-gauge used by bending Nobel original.

    Kato's Drill Kit for Zygomatic Bone Osteotomy.




    コメント

    このブログの人気の投稿

    あなたはワクチン派 ? Are you Still in Favor of Vaccines?

    モニター募集

    インプラントの運命 The Fate of Implants